Table 8.1 Unit Costs

Water System Master Plan

City of Morgan Hill

PRELIMINARY

Pipelines

Pipe Size

Cost

2

(in)

($/lineal foot)

6

$160

8

$180

10

$207

12

$229

16

$276

18

$297

20

$340

24

$372

30

$412

36

$485

Pressure Reducing Stations

Size

(in)

Cost

($)

3" valve

$47,300

6" valve

$77,400

Storage Reservoirs ($/gallon)

≤1.0 MG

$2.15

1.1 MG-3.0 MG

$1.72

3.1 MG - 5.0 MG

$1.24

> 5 MG

$0.92

Groundwater Wells

800 gpm Capacity

$2,340,000

Notes:

2/16/2017

1. Construction costs estimated using January 2017 ENR CCI of 10,532.

2. Pipeline unit costs based on water main construction estimates provided by

City staff.

Pump Stations

Estimated Pumping Station Project Cost =

2.075*10

(0.7583*log(Q)+3.1951)

where Q is in gpm