City of Morgan Hill
Water System Master Plan
inspection, and legal costs. The project related costs in this master plan were estimated by
applying an additional
30 percent
to the estimated construction costs.
8.3 CAPITAL IMPROVEMENT PROGRAM
This section documents the capital improvement program, contingencies included in the costs,
and the allocation of costs to meet the requirements of AB1600.
8.3.1
Capital Improvement Costs
The Capital Improvement Program costs for the projects identified in this master plan for
mitigating existing system deficiencies and for serving anticipated future growth throughout the
City are summarized on
Table 8.2
.
Each improvement was assigned a unique coded identifier associated with the improvement type
and is summarized graphically on
Figure 8.1
. The estimated construction costs include the
baseline costs plus
30 percent
contingency allowance to account for unforeseen events and
unknown field conditions, as described in a previous section. Capital improvement costs include
the estimated construction costs plus
30 percent
project-related costs (engineering design,
project administration, construction management and inspection, and legal costs).
8.3.2
Recommended Cost Allocation Analysis
Cost allocation analysis is needed to identify improvement funding sources, and to establish a
nexus between development impact fees and improvements needed to service growth. In
compliance with the provisions of Assembly Bill AB 1600, the analysis differentiates between the
project needs of servicing existing users and for those required to service anticipated future
developments. The cost responsibility is based on model parameters for existing and future land
use, and may change depending on the nature of development.
Table 8.2
lists each improvement,
and separates the cost by responsibility between existing and future users.
8.4 SUGGESTED EXPENDITURE BUDGET
This section discusses the suggested expenditure budget for the capital improvement plan
horizon as well as the recommended sequence of construction for capital improvement planning.
8.4.1
5-Year Capital Improvement Costs and Phasing
The capital improvement program costs and phasing for the next five fiscal years (FY) are
summarized on
Table 8.3
; this plan includes the total costs for pipelines, tanks, booster stations,
and valves to be constructed. The improvements listed are also categorized by improvement
classification, indicating whether the improvement is intended to expand or replace the existing
water distribution system infrastructure.