Trans Adriatic Pipeline
TRA-F-051
Project
Pipeline including CS
FID
Update Date
24/05/2016
Advanced
Description
The Trans Adriatic Pipeline (TAP) will transport natural gas from Kipoi in Greece near the Greek/Turkish border, via Albania and across the Adriatic
Sea, to Italy’s southern Puglia region in Province of Lecce. In its upstream part, TAP will interconnect with TANAP which is linked further to the east
with systems in Turkey, to secure access to the Shah Deniz natural gas field in Azerbaijan and tie into Italy’s gas transportation grid operated by
Snam Rete Gas in the province of Lecce. TAP's capacity can be expanded up to a total of 20 bcm/a, subject to binding market demand. The
Expansion Capacity will be offered to the market via market tests, from no later than start of operations and subsequently every two years.
Regulatory Decisions and
similar material conditions
Capacity Increments Variant For Modelling
Point
Operator
Year
From Gas System To Gas System Capacity
Gostivar (MK) / TAP
Trans-Adriatic Pipeline AG
2019
GR/TAP
MK
25.0 GWh/d
Comment: Point not in TAP's initial design.
GCV used for capacity calculations: 11.071 kWh/Sm3.
Incremental capacity available for allocation is subject to a check of the system's capabilities
and dependent on the capacity bookings in place.
Ionic-Adriatic Pipeline - IAP Entry
Trans-Adriatic Pipeline AG
2019
GR/TAP
IB-HRi/IAP
150.0 GWh/d
Comment: Point not in TAP's initial design.
GCV used for capacity calculations: 11.071 kWh/Sm3.
Incremental capacity available for allocation is subject to a check of the system's capabilities
and dependent on the capacity bookings in place.
Kipi (TR) / Kipi (TAP)
Trans-Adriatic Pipeline AG
2019
TR/TNP
GR/TAP
350.0 GWh/d
Comment: GCV used for capacity calculations: 11.071 kWh/Sm3.
Komotini - TAP / IGB
Trans-Adriatic Pipeline AG
2019
GR/TAP
BG/IGB
142.0 GWh/d
Comment: GCV used for capacity calculations: 11.071 kWh/Sm3.
Melendugno - IT / TAP
Trans-Adriatic Pipeline AG
2019
GR/TAP
IB-ITs
334.0 GWh/d
Generated by ENTSOG PDWS on 10/10/2016 05:00:19 PM
Page 219 of 620
Current TYNDP : TYNDP 2017 - Annex A
Southern Corridor GRIP 2017–2026 Annex B |
123