Trans Adriatic Pipeline

TRA-F-051

Project

Pipeline including CS

FID

Update Date

24/05/2016

Advanced

Description

The Trans Adriatic Pipeline (TAP) will transport natural gas from Kipoi in Greece near the Greek/Turkish border, via Albania and across the Adriatic

Sea, to Italy’s southern Puglia region in Province of Lecce. In its upstream part, TAP will interconnect with TANAP which is linked further to the east

with systems in Turkey, to secure access to the Shah Deniz natural gas field in Azerbaijan and tie into Italy’s gas transportation grid operated by

Snam Rete Gas in the province of Lecce. TAP's capacity can be expanded up to a total of 20 bcm/a, subject to binding market demand. The

Expansion Capacity will be offered to the market via market tests, from no later than start of operations and subsequently every two years.

Regulatory Decisions and

similar material conditions

Capacity Increments Variant For Modelling

Point

Operator

Year

From Gas System To Gas System Capacity

Gostivar (MK) / TAP

Trans-Adriatic Pipeline AG

2019

GR/TAP

MK

25.0 GWh/d

Comment: Point not in TAP's initial design.

GCV used for capacity calculations: 11.071 kWh/Sm3.

Incremental capacity available for allocation is subject to a check of the system's capabilities

and dependent on the capacity bookings in place.

Ionic-Adriatic Pipeline - IAP Entry

Trans-Adriatic Pipeline AG

2019

GR/TAP

IB-HRi/IAP

150.0 GWh/d

Comment: Point not in TAP's initial design.

GCV used for capacity calculations: 11.071 kWh/Sm3.

Incremental capacity available for allocation is subject to a check of the system's capabilities

and dependent on the capacity bookings in place.

Kipi (TR) / Kipi (TAP)

Trans-Adriatic Pipeline AG

2019

TR/TNP

GR/TAP

350.0 GWh/d

Comment: GCV used for capacity calculations: 11.071 kWh/Sm3.

Komotini - TAP / IGB

Trans-Adriatic Pipeline AG

2019

GR/TAP

BG/IGB

142.0 GWh/d

Comment: GCV used for capacity calculations: 11.071 kWh/Sm3.

Melendugno - IT / TAP

Trans-Adriatic Pipeline AG

2019

GR/TAP

IB-ITs

334.0 GWh/d