79

Infrastructure - Engineering & Inspections

BUDGET HIGHLIGHTS

The FY 17-18 Budget is increasing by $331,538, or 1.7%.

The Budget includes a net increase of one FTE in FY 17-18, factoring in a transfer out of two FTEs and

an increase of three FTEs.

The Soil Erosion program is being moved from Engineering and Inspections to the Stormwater Fund,

including two FTEs.

Position increases include the FY 16-17 mid-year addition of an Electrical Inspector, a new Civil Engineer

position that was transferred from Stormwater, and the addition of a Custodian related to facility

enhancements such as the planned opening of the Barber Park Memorial to Women & Community

Building.

2015-16

2016-17

2017-18

2018-19

Actual

Budget

Adopted

Projected

Expenditures:

Personnel Costs

10,641,588

11,451,864

11,868,097

12,188,631

Maintenance & Operations

6,862,003

8,145,972

8,048,372

8,761,046

Capital Outlay

5,040

12,295

25,200

49,200

Total

17,508,632

19,610,131

19,941,669

20,998,877

Total FTE Positions

162.500

164.500

165.500

165.500

Revenues:

User Charges

856,889

304,010

203,160

203,160

Internal Charges

1,416,000

1,416,000

1,536,000

1,536,000

Licenses/Permits

3,518,286

2,974,199

3,242,455

3,379,740

Transfers

850,000

850,000

850,000

850,000

All Other

87,833

76,080

38,380

39,880

Subtotal

6,729,008

5,620,289

5,869,995

6,008,780

General Fund Contribution

10,779,624

13,989,842

14,071,674

14,990,097

Total

17,508,632

19,610,131

19,941,669

20,998,877

BUDGET SUMMARY