Article 11 Environmental Standards

11-30 Swift Creek Water Supply Watershed

Wake County Unified Development Code

11-10

(A)

The inner 50 feet (“Zone 1”) of required 100

-foot buffers along perennial streams that is

not covered by a conservation easement must be labeled on the plat as a “reserved

conservation parcel” and restricted from future use or conveyance as a development lot.

Reserved conservation parcels must be dedicated to

a property owners’ association or

recognized land conservation agency.

(B)

Reserved conservation parcels and remnants are exempt from the lot area and width

standards of the underlying zoning district and from UDO standards requiring frontage on a

public or private road, provided that a pedestrian access easement is provided to the parcel,

with a minimum width of 10 feet.

(C)

Under the reserve parcel option, development lots may not be platted within the inner 50

feet of required 100-foot buffers along perennial streams.

11-25

Density and Impervious Surface Calculations

11-25-1

The land area included within conservation easements and reserved conservation parcels

will be included in calculating the allowable density for a cluster or open space subdivision.

11-25-2

The land area included within conservation easements and reserved conservation parcels

will be included in calculating the allowable impervious surface coverage within a

subdivision.

Sections 11-26 through 11-29 are reserved for future use

Part 3

Special Watershed Areas

11-30

Swift Creek Water Supply Watershed

11-30-1

Development in the Swift Creek Water Supply Watershed is subject to the requirements of

the Swift Creek Land Management Plan in addition to other applicable standards of this

ordinance. See also Article 9 of this ordinance.

11-30-2

All residential and commercial properties require a preliminary site plan prepared by a

licensed professional land surveyor, landscape architect, architect, or engineer.

11-30-3

An as-built plan prepared by a licensed professional land surveyor is required for all lots

before a Certificate of Occupancy may be issued.

11-30-4

In addition to the standards of the underlying zoning districts, the following standards apply

to all land within the Swift Creek Water Supply Watershed:

Standards

Critical Area

Non-Critical Area

Rural

Urban

Rural

Suburban – New

Urban - New

Existing Urban

Limited

Res*

Limited

Res*

Res Nonres

Res

Nonres

Res

Nonres Res & Nonres

Maximum Density

(DU/acre)

0.5

2.5

1

n/a

2.5

n/a

6 east of Holly

Springs Rd.; may

exceed 6 west of

Holly Springs Rd.

n/a Res. Controlled

by underlying

zoning; Nonres.

n/a

Max. Impervious

Surface Ratio (%)

[8]

6

6 [1]

12 [2] 12 [2]

12 [3]

12 [3]

12 [4]

12 [4] 12 [4]

Impoundments and

Maintenance [5]

Allowed

[9]

Required if over 12% impervious, public or private maintained

Municipal Sewer [6] Prohibited

[7]

Required if

over 6%

Prohibited [7]