Gas Regional Investment Plan of the South Region 2017 |

67

FR

ES

PT

0

250

150

LNG

Pipe (= IP + Import)

TOTAL

100

50

200

300

%

Entry capacity / Average Demand 2020 Blue Transition

102%

179%

268%

192%

110%

89%

82%

177%

Import

67%

0%

45%

279%

IP

22%

82%

132%

0

2

4

6

8

10

12

16

14

18

20

Portugal

South Region

Infrastructure projects in the South Region

Spain

France

Pipeline

LNG

UGS

Differences between interconnection and LNG capacities in each country are a con-

sequence of each country’s geographical situation, transit needs and energy policy.

In TYNDP 2017, 29 projects to develop gas infrastructure are located in the South

Region, representing 12% of all projects.

Figure 6.2:

Entry firm capacity (GWh/d), excluding UGS, compared to average demand (GWh/d,

Blue transition, in 2020). (Source: TYNDP 2017 Infrastructure projects in the South

Region)

Figure 6.3:

Infrastructure projects in the South Region (Source: TYNDP 2017)