Infrastructure projects in the South Region
Spain
France
Pipeline
LNG
UGS
Differences between interconnection and LNG capacities in each country are a con-
sequence of each country’s geographical situation, transit needs and energy policy.
In TYNDP 2017, 29 projects to develop gas infrastructure are located in the South
Region, representing 12% of all projects.
Figure 6.2:
Entry firm capacity (GWh/d), excluding UGS, compared to average demand (GWh/d,
Blue transition, in 2020). (Source: TYNDP 2017 Infrastructure projects in the South
Region)
Figure 6.3:
Infrastructure projects in the South Region (Source: TYNDP 2017)