Gas Regional Investment Plan of the South Region 2017

5.4.3 CAPACITY SUBSCRIPTION AT IPS BETWEEN

SPAIN AND PORTUGAL (VIP IBERICO)

After October 2014, the cross-border capacity between Spain and Portugal is mar-

keted in the VIP (Virtual Interconnection Point): VIP Iberico.

In the Spain–Portugal direction, approximately two thirds of the capacity is booked

in the long term.

In the Portugal –Spain direction, as of today no capacity is booked.

Physically, the flow is always Spain – Portugal direction; Portugal – Spain flow is a

back hole flow capacity.

0

250

200

175

150

125

100

75

50

25

225

GWh/d

Booked Capacity ES-PT

Booked Firm Capacity ES-PT

Physical flow (ES-PT)

Available Capacity

VIP Iberico (Spain – Portugal direction)

Jan 14

Jul 14

Jan 15

Jul 15

Jan 16

Jul 16

Jan 17

Jan 18

Jul 17

Figure 5.16:

Capacity subscription at IPs between Spain and Portugal (VIP Iberico),

Spain – Portugal direction (Source: TSO own elaboration)

0

250

200

175

150

125

100

75

50

25

225

GWh/d

Booked Capacity PT-ES

Booked Firm Capacity PT-ES

Physical flow (PT-ES)

Available Capacity

VIP Iberico (Portugal – Spain direction)

Jan 14

Jul 14

Jan 15

Jul 15

Jan 16

Jul 16

Jan 17

Jan 18

Jul 17

Figure 5.17:

Capacity subscription at IPs between Spain and Portugal (VIP Iberico),

Portugal – Spain direction (Source: TSO own elaboration)