Gas Regional Investment Plan of the South Region 2017
5.4 IP Subscription and Use
5.4.1 CAPACITY SUBSCRIPTION AT NORTH-SOUTH
LINK (FRANCE)
Since April 2014, firm capacity has been set to 270GWh/d, to which up to 150GWh/d
of interruptible capacity can be booked. GRTgaz also offers additional service to
maximise the access to TRS with the JTS (Joint Transport Storage service) and mar-
ket coupling mechanism. Annual capacities are sold through auctions once a year,
annual interruptible capacity is available only if 95% of firm capacities has been
sold. Since the North South link will disappear in November 2018, last auction for
annual available capacity will occur in March 2018.
Use of the North-South link is still very high, with a 95% use of available technical
capacity in 2016. Firm capacity in the opposite direction is booked at 26%.
0
500
400
350
300
250
200
150
100
50
450
Booked Firm Capacity North-South
Booked Interruptible Capacity North-South
Firm Capacity North-South
Allocation
Interruptible Capacity North-South
Available Interruptible Capacity North-South
Available Firm Capacity North-South
North-South Link (North – South direction)
Jan 14
Jul 14
Jan 15
Jul 15 Jan 16
Jul 16
Jan 17
Jul 17
Jan 18 Jul 18
GWh/d
Figure 5.12:
Capacity subscription at North-South Link (France), North-South direction
(Source: TSO own elaboration)
0
600
400
300
200
100
500
North-South Link (South – North direction)
Booked Firm Capacity South-North
Booked Interruptible Capacity South-North
Firm Capacity South-North
Allocation
Interruptible Capacity South-North
Available Interruptible Capacity South-North
Available Firm Capacity South-North
Jan 14
Jul 14
Jan 15
Jul 15 Jan 16
Jul 16
Jan 17
Jul 17
Jan 18 Jul 18
GWh/d
Figure 5.13:
Capacity subscription at North-South Link (France), South-North direction
(Source: TSO own elaboration)