Previous Page  14 / 72 Next Page
Information
Show Menu
Previous Page 14 / 72 Next Page
Page Background

LOPA Exercise PSLG WG3

12/02/2009

1

PSLG WG 3

LOPA SUBGROUP

Dave Ransome

P &I Design Ltd

1

PSLG WG 3

Part of the work of the PSLGWorking

Group 3 is to provide guidelines in the

use of LOPA as a tool in accessing the

layers of protection required to prevent

a tank overfill leading to an OFCE.

A WG3 sub-group conducted a LOPA

with the assistance of a UK Terminal

with both ship and pipeline imports.

2

LOPA Subgroup Exercise

The terminal manager outlined the

operating principles and methods of

transferring product into the

terminal.

Imports are to one of two tanks from

either ship or pipeline.

All imports were to a single tank, no

multiple tank imports are performed.

3

Pipeline Import

Pipeline imports are from a

dedicated source and the total parcel

of the import is for the terminal. The

transfer is a batch process of a known

quantity with no product changeover.

When on pipeline transfer no other

receiver is connected to the pipeline.

4

APPENDIX 1