ROADPROJECTS

CRABTREE

HATCHER-CREEK

GREENWAY

MCCRIMMON

PARKWAY EXTENSION

The McCrimmon Parkway Extension

contractor installed the potable water

main located in the new section of

roadway

near

Sheetz.

This

installation will finalize the grade and

base section for the new roadway in

the area, as show above.

CAROLINA STREET

EXTENSION

Design work for the Carolina Street

Extension is complete and in

review. The project, which will

construct a roundabout on Town

Hall Drive, will connect Carolina

Street and extend Foxglove Drive,

and is estimated to go out to bid in

February.

This quarter the street net-

work design was completed

for the Town Center Core

project.

The mixed-use project will

be at the intersection of

Town Hall Drive and Caroli-

na Street, and will include

residential and commercial

uses as well as a Wake

County Public Library.

The 8,500 square foot library entered the design phase this quarter.

Construction is anticipated to start in the fall of 2018 with a planned

open date in the fall of 2019.

Street construction is scheduled to start this spring. Next steps in-

clude Town Council selecting a preferred developer for the public/

private partnership, executing a Memorandum of Understanding and

ultimately a development agreement.

DEVELOPMENT SERVICES

|

CAPITAL PROJECTS 13

MORRISVILLE

CARPENTER ROAD

Morrisville Carpenter Road is being

improved between Page Street and

Davis Drive. The project will include

widening the road to four lanes,

adding curb-and-gutter and side-

walk and replacing some culverts.

The goal of the project is to make

the road safer for drivers and

pedestrians.

This quarter, design work reached

75 percent completion and received

review and approval by NCDOT.

Top:

During the second quarter, all

boardwalks were installed.

Bottom Left:

The paved section and

new fencing were completed at Cedar

Fork Park.

Bottom Right:

The greenway sec-

tion facing Davis Drive behind

Walmart Foods was also completed

this quarter.

TOWN CENTER CORE