Cityworks SR and WO - page 30

U fO
Entit'l Group: Water
.:J
Category:
r.
Feature
r
Object
r
Other
Control Valve
lili
Manhole
Pressurized Main
l
Statu s:
Requested
By:
Open
GUNTER, BOBBY 0
~
FlllSh
Install new
Paint
Re air
Replace
.:::J
Farm,.D
.:J
Prioritv:
.:J
Super... isor:
Medium
GUNTER, BOBBY D
Submit To:
ROBERTS, GUY F
T:J
Projected Start: 315120133:06 PM
Stage: klual
d
Expense TVpe: Mainlenance
Comments:
Instruction s:
3. Select an Elltity Group from the drop-down list.
4. Click the Features radio button.
.:J
~
.:::J
p
.:J
Ll
~
.::J
5. Select the asset type from the list on the left. Work order templates associated with the asset type
will display on the right when the asset type is selected.
6. Click on the desired maintenance activity from the list on the right.
7. Fill out the desired fields on the General panel.
8. Click
l id
Create
I.
The work order will display.
9.
If
desired, type a description of the work location in the Location Details box of the Location
Information panel. Even though this work order is not attached to an asset, it's helpful to have
some information about the type of work being done.
10. Click [ ld Save
I
Server AMS 2013
SPl
End User Training Manual
Section 5: The Work Order
0
85
1...,20,21,22,23,24,25,26,27,28,29 31,32,33,34,35,36,37,38,39,40,...62
Powered by FlippingBook