Objectives
To determine the hazards, hazardous events and hazardous situations relating to the EUC and the
EUC control system (in all modes of operation), for all reasonably foreseeable circumstances,
including fault conditions and reasonably foreseeable misuse (see 3.1.14 of IEC 61508-4);
To determine the event sequences leading to the hazardous events; The scope will be dependent
upon the phase reached in the overall, E/E/PE system and software safety lifecycles (since it may
be necessary for more than one hazard and risk analysis to be carried out). For the preliminary
hazard and risk analysis, the scope will be as defined by the output of the overall scope definition.
IEC 61508
Part 1 Clauses
7.4.1
7.4.2
IEC 62061
Not covered
In the introduction
Figure 1 references ISO
12100 and 14121 for the
design and risk
assessment of the
machine
Note: 12100 and 14121
are now combined
ISO 13849
Not covered
Clause 4.1:
The SRP/CS shall be
designed and
constructed so that the
principles of ISO 12100
and ISO 14121 are fully
taken into account
Hazard and risk analysis