Table of Contents Table of Contents
Previous Page  226-227 / 975 Next Page
Information
Show Menu
Previous Page 226-227 / 975 Next Page
Page Background

TÜV SÜD Product Service

Home Phases 1-5 Phases 6-16

6

Objectives

To develop a plan for operating and maintaining the E/E/PE safety-related systems, to ensure that

the required functional safety is maintained during operation and maintenance

IEC 61508

Part 1 Clauses

7.7.1

7.7.2

IEC 62061

“Planning” is not

covered separately.

ISO 13849

Not covered

Note: ISO 12100 is

referenced in clause 9

(Maintenance)

Overall operation and maintenance planning