TÜV SÜD Product Service
Home Phases 1-5 Phases 6-168
Objectives
To develop a plan for the installation of the E/E/PE safety-related systems in a controlled manner,
to ensure that the required functional safety is achieved; To develop a plan for the commissioning
of the E/E/PE safety-related systems in a controlled manner, to ensure that the required functional
safety is achieved.
IEC 61508
Part 1 Clauses
7.9.1
7.9.2
IEC 62061
Clause 6.13.2.1 – A
SRECS shall be installed
in accordance with the
functional safety plan for
the final system
validation (clause 4.2.1
item (h))
ISO 13849
Not covered
Overall installation and commissioning planning