Table of Contents Table of Contents
Previous Page  240-241 / 975 Next Page
Information
Show Menu
Previous Page 240-241 / 975 Next Page
Page Background

TÜV SÜD Product Service

Home Phases 1-5 Phases 6-16

11

Objectives

To create other risk reduction measures to meet the safety functions requirements and safety

integrity requirements specified for such systems (outside the scope of this standard).

IEC 61508

Part 1 Clauses

7.12.1

7.12.2

IEC 62061

Not covered

ISO 13849

Not covered

Other risk reduction measures