TAR NC Implementation Document – Second Edition September 2017 |

115

Periodic Consultation

CONTENT OF THE DOCUMENT FOR PERIODIC

CONSULTATION AND COMPARISON TO

CHAPTER VIII ‘PUBLICATION REQUIREMENTS’

Responsibility: consultation by TSO/NRA, as NRA decides; decision by NRA

This section describes the content of the consultation document, while the following

section details the consultation procedure.

Table 11 shows the responsibility split between TSOs and NRAs for conducting the

consultation per Article 26(1).

RESPONSIBILITY SPLIT BETWEEN TSOs/NRAs FOR CONSULTATION

PER ARTICLE 26(1)

MS

Who is responsible for

conducting consultation

per Art. 26(1)?

MS

Who is responsible for

conducting consultation

per Art. 26(1)?

Austria

NRA

Italy

NRA

Belgium

TSO

Latvia

To be decided

Bulgaria

TSO/NRA

Lithuania

TSO/NRA

Czech Republic

NRA

Netherlands

NRA

Croatia

To be decided

Poland

TSO

Denmark

TSO/NRA

Portugal

NRA

Finland

NRA

Romania

NRA

France

NRA

Slovakia

TSO

Germany

NRA

Slovenia

To be decided

Greece

NRA

Spain

NRA

Hungary

NRA

Sweden

To be decided

Ireland

TSO/NRA

United Kingdom TSO

ARTICLE 26(1)

Table 11:

Responsibility split between TSOs/NRAs for consultation per Article 26(1)