TAR NC Implementation Document – Second Edition September 2017

The consultation document for the final consultation must include information listed

in Table 12. The section below describes the difference between the ‘final’ and the

‘intermediate’ consultations.

CONTENT OF THE FINAL CONSULTATION DOCUMENT UNDER ARTICLE 26(1)

Article 26 (1)

Content of consultation

Comparison with Articles 29 and 30

(a) Proposed RPM

Assumptions and justification for parameters used in

the proposed RPM per Article 30(1)(a)

Article 30(1)(a): examples are provided,

‘justification’

is not covered

Proposed adjustments for points with storage,

LNG facilities and infrastructure ending isolation of

a MS per Article 9

Article 30(1)(c)(iii): part of the

‘reference prices and

other prices applicable at points other than where the

CAM NC applies’

Indicative reference prices

Article 29: reserve prices at points where the

CAM NC applies

Article 30(1)(c)(iii): part of

‘reference prices at points

other than where the CAM NC applies’

Results, components and their details for CAA

per Article 5

Article 30(1)(v)(3): partially covered by

‘intra-system/cross-system split’

Assessment of the RPM

Not covered

Comparison of RPM to the CWD in Article 8

Not covered

(b) Revenue and

splits

Indicative allowed and / or target revenue

Article 30(1)(b)(i): allowed and/or target revenue

Indicative transmission services revenue

Article 30(1)(b)(iv): transmission services revenue

Indicative splits of capacity-commodity revenues,

entry-exit revenues, intra-system/cross-system

revenues

Article 30(1)(b)(v): splits of capacity-commodity

revenues, entry-exit revenues, intra-system /

cross-system revenues

(c) Commodity-

based and

non-transmis-

sion tariffs

Manner in which they are set

Article 30(1)(c): covered by

‘relevant information

related to their [tariffs] derivation’

Share of the allowed or target revenue to be

recovered by these tariffs

Article 30(1)(b)(v)(1): covered by

‘capacity-commodi-

ty split’

for commodity-based transmission tariffs

Article 30(1)(b)(i) and (iv): covered by

‘allowed

and / or target revenue’

and ‘

transmission services rev-

enue’

for non-transmission tariffs

For non-transmission tariffs, manner of revenue

reconciliation

Not covered

Indicative tariffs

Article 30(1)(c)(i): commodity-based transmission

tariffs

Article 30(1)(c)(ii): non-transmission tariffs

(d) Changes in

transmission

tariffs

Changes in tariffs for comparable services from the

prevailing tariff period to the tariff period for which

information is published – indicative comparison

between: (1) prevailing tariffs at the time when the

consultation document is published; and (2) indicative

tariffs based on the proposed RPM

Article 30(2)(a)(i)

Changes in tariffs for comparable services from the tar-

iff period for which information in published to each

subsequent tariff period until the end of the prevailing

regulatory period – indicative forecast based on the

proposed RPM

Article 30(2)(a)(ii)

At least a simplified tariff model to calculate tariffs

and estimate a possible future evolution

Article 30(2)(b)

(e) Fixed

payable price

approach

Proposed index

Not covered

Risk premium: calculation and proposed use

Not covered

Where and when such approach is proposed

Not covered

Process for offering capacity at IPs where both fixed

and floating price approaches are offered

Not covered

Table 12:

Content of the final consultation document under Article 26(1)