104

CIP Project:

Project Category:

Site:

Description:

Picture/Map:

Justification:

Other Considerations:

Preliminary Estimate

All projects include in estimate a 25% contingency based on construction cost.

Strategic Goal:

Economic Prosperity

There are current and future needs in the Town Center Core for parking infrastructure to support the

public needs such as the Food Hub site and other planned events as well as private interest.

Town Center Parking

Public Facility

TBD

Public parking to support community use and business development in the Town Center.

With the previously identified space now programmed for the Food Hub, parking solutions within the

Town Center Core will need to be addressed. Cost estimate shown below is based on a surface

parking solution and a site location is dependent on continued converations on the Town Center Core

vision.

425,000

$

Includes: Design & Construction