99

CIP Project:

Project Category:

Site:

Description:

Picture/Map:

Justification:

Other

Considerations:

Preliminary Estimate

All projects include in estimate a 25% contingency based on construction cost.

Strategic Goal:

Public Safety Readiness

Park West Fire Station

Transportation

Morrisville Parkway between Chapel Hill Road and Bristol Creek

Construct Fire Station #4 to improve response times and service to the south side of the Town and

positively impact accreditation. The facility would include two apparatus bays, ten dorms and the

needed auxiliary space to accommodate two companies. The auxiliary space could potentially allow

for the relocation of Fire Administration from the current PSMS facility.

The fire protection study indicated a significant need for a fire station in this location based on the

data and standard's of coverage to improve response times to this service area. Property in this area

is limited. Potential scenarios include use of undeveloped land or renovation of existing structures.

The project requires land acquisition, construction and equipment. This facility would require new

personnel and reassignment of fire apparatus.

4,900,000

$

Includes: Design, Construction, permits, furnishings