CIP Project:
Project Category:
Site:
Description:
Picture/Map:
Justification:
Other
Considerations:
Preliminary Estimate
All projects include in estimate a 25% contingency based on construction cost.
Strategic Goal:
Public Safety Readiness
Park West Fire Station
Transportation
Morrisville Parkway between Chapel Hill Road and Bristol Creek
Construct Fire Station #4 to improve response times and service to the south side of the Town and
positively impact accreditation. The facility would include two apparatus bays, ten dorms and the
needed auxiliary space to accommodate two companies. The auxiliary space could potentially allow
for the relocation of Fire Administration from the current PSMS facility.
The fire protection study indicated a significant need for a fire station in this location based on the
data and standard's of coverage to improve response times to this service area. Property in this area
is limited. Potential scenarios include use of undeveloped land or renovation of existing structures.
The project requires land acquisition, construction and equipment. This facility would require new
personnel and reassignment of fire apparatus.
4,900,000
$
Includes: Design, Construction, permits, furnishings