CIP Project:

Project Category:

Site:

Description:

Picture/Map:

Justification:

Other

Considerations:

Preliminary Estimate

All projects include in their estimate a 25% contingency based on construction cost.

Strategic Goal:

The fire protection study demonstrated through analysis of response data that performance to this

area is not favorable with 60% of the response calls for service resulting over 4 minutes. The

addition of a fire station would greatly reduce response times and the aide accreditation aligning to

the Town's Strategic Plan.

Northwest Fire Station

Public Safety

Cisco Site (Kit Creek/Louis Stephens Drive)

Design and construct a fire station in the Northwestern area of the fire district, approximately 12,000

square feet in size. Improve response times to all types of emergencies by locating a fire station

more strategically in the northwestern area of the fire district.

The site presents some topography challenges and will require a feasibility study to determine

viability of constructing a fire station on the donated Cisco land. Should the property not be utilized

for a fire station the property ownership reverts back to Cisco. This property could not be surpluses.

5,750,000

$

Includes: Land Cost, Design, Construction &

Fixtures

Public Safety Readiness