93
CIP Project:
Project Category:
Site:
Description:
Picture/Map:
Justification:
Other
Considerations:
Preliminary Estimate
All projects include in estimate a 25% contingency based on construction cost.
Strategic Goal:
Thriving, Livable Neighborhoods
The project aims to protect limited open space through the acquisition of park land as identified by the
Parks & Recreation Master Plan over the next 10 years with a variety of park classifications
contributing to the overall total acreage of parkland. This would include focus areas within the Town
Center area, historic preservation and open green space.
Future Town Parks/Open Space
Parks & Recreation
Undeveloped open space/land in Morrisville
Develop a robust park system with adequate acreage and various park classifications, equitably
distributed throughout the Town.
The master plan indicates a service deficiency of nearly 40 acres in meeting the NRPS level of service
standards (9.6 acres per 1,000 residents) for recommended acreage of parkland per population for the
year 2017. To keep pace with projected population growth, the Town would need to add up to 135
acres of land over the next 10 years to meet recreational needs for a growing Town. Large tracts of
undeveloped land are more difficult to secure.
7,250,000
$
Includes: Land Cost, Design and Construction