91

CIP Project:

Project Category:

Site:

Description:

Picture/Map:

Justification:

Other Considerations:

Preliminary Estimate

All projects include in estimate a 25% contingency based on construction cost.

Strategic Goal:

Improved Transportation Mobility

Crabtree Hatcher Creek Greenway Loop

Serves the interest of mobility and connectivity. The upated CTP indicates the need for a sidewalk on

both sides of road to be in compliance. A sidewalk segment exists currently on the southwest side of

roadway. This project could also be considered a sidewalk gap projectrather than a greenway

connection.

660,000

$

Includes: ROW, Design and Construction

Bicycle & Pedestrian

FromMorrisville Parkway to the end of Crabtree Crossing Parkway where Crabtree Hatcher

Creek Greenway starts.

Improve greenway connectivity from the Crabtree Hatcher Creek Greenways by extending a multi-use

path about 0.50 miles along Crabtree Crossing fromMorrisville Parkway to current greenway end,

within existing ROW.

This project will improve connectivity and promote non-vehicular transportation as an extension

from the Crabtree Hatcher Creek Greenway. The recent needs assessment survey indicated the top two

desired amenities were walking trails and linked greenways, and is included in the Parks &

Greenways Master Plan. Project could possibly qualify for grant funding through CAMPO or other

transportation related options.