CIP Project:
Project Category:
Site:
Description:
Picture/Map:
Justification:
Other
Considerations:
Preliminary Estimate
All projects include in estimate a 25% contingency based on construction cost.
Strategic Goal:
Engaged, Inclusive Community
The master plan survey rated a nature park and greenway as the #2 priority and this location would
require no land acquisition since it is currently owned by the Town. This location has close access to
NC54, a mix of wetland & natural forest along with utilities in close proximity to support facilities.
The site would offer an additional large shelter, the Town's first fully ADA accessible playground and
would be the first Town developed park on the east side of NC54.
Crabtree Creek Nature Park
Parks & Recreation
Along Crabtree Creek next to Weston Estates subdivision entrance on Keybridge Drive
near NC 54.
Develop a passive recreation location with nature park attributes abutting Cedar Fork District Park
and Crabtree Creek on Keybridge Drive. The concept plan includes parking, picnic shelter, restroom
facility, nature trail, boardwalk, off road bike trails and large ADA inclusive playground along with
interpretive signage about ecology/wildlife.
Staff would need to determine the impact of Wake County's flood easement. There is value with the
ADA accessibility of this facility, it would provide a nice complementary facility to serve as trailhead
to Crabtree Hatcher Creek Greenway, along with a playground amenity in this area for commuters.
Additionally, it would provide enhancements to Cedar Fork District Park.
4,910,000
$
Includes: Design and Construction