CIP Project:

Project Category:

Site:

Description:

Picture/Map:

Justification:

Other

Considerations:

Preliminary Estimate

All projects include in estimate a 25% contingency based on construction cost.

Strategic Goal:

Improve Transportation Mobility

Airport Boulevard Extension

Transportation

Intersection of Garden Square Lane and Airport Boulevard to Church Street

Phase one extension of Airport Boulevard (0.77 miles) would connect Davis Drive to Church Street.

Roadway improvement would include a 4-lane cross-section with a 17.5 - 31 foot wide median, a 10

foot side path on the south side and 5 foot sidewalk on the north side, and wide outside lanes.

The Comprehensive Transportation Plan identifies this as another east-west route in Town,

connecting Church Street to Davis Drive. The extension will also tie into a future grade separation of

Airport Boulevard and the railroad/NC54 creating a full east-west connection from Davis Drive to I-40

and the Airport.

The extension will qualify for LAPP funds from CAMPO and in prior submittals by NCDOT has scored

well in the LAPP criteria. However the Town will need to provide a higher match to ensure a high

score. This project is described as a mid-term (15-24 years) project.

6,900,000

$

Includes: Design, Construction, permits, furnishings