Table of Contents Table of Contents
Previous Page  38 / 154 Next Page
Information
Show Menu
Previous Page 38 / 154 Next Page
Page Background

37

livable neighborhoods Objective 2.5: Plan and provide for current and

future infrastructure.

Park Improvements:

Allocation of funds to support the needs of aging park facilities to

maintain quality fixed assets and meet the needs of customers

.

Connect Morrisville >

Public safety readiness and Thriving, livable neighborhoods.

Morrisville Community Park Playground Upgrade – Installation of new and updated

playground safety surfacing and repainting of play structures. The safety surfacing is

seventeen years old. The poured in place rubber surfacing and the loose wood fill are

beyond their useful life and can no longer keep the area safe with routine

maintenance. The two main metal play structures will be cleaned and repainted

.

Park Area Water Lines – Installation of new irrigation water lines at Morrisville

Community Park athletic fields and Cedar Fork District Park athletic fields needed to

assist with proper maintenance.

157,500

-157,500

Parkland PIL

Morrisville Community Park Fitness Station:

Purchase and installation of fitness

equipment at Morrisville Community Park. The fitness station would be adjacent to the

playground to facilitate upper body, lower body and core exercises. The department can

also use this site for exercise programs through MAFC or outside contractors. A grant is

available through the National Fitness Campaign to offset some of the cost and may

provide assistance with acquiring business sponsors through their established networks

.

Connective Morrisville > Engaged inclusive community Multiple Objectives

.

145,000

-115,000

-30,000

Parkland PIL

NFC Grant

Municipal Service District:

Town allocation of funds to support the completion of

Municipal Service District Projects. The final project, The Gables, is projected for

construction in FY2021.

Connect Morrisville > Thriving, livable neighborhoods

Objective 2.5: Plan and provide for current and future infrastructure.

110,000

Church Street Park Amenities:

Installation of site improvements at Church Street

Park that will help enhance the facility for use by patrons, visitors, spectators, officials and

players

.

Connective Morrisville > Engaged inclusive community Multiple

Objectives.

Fitness Station – purchase and installation of outdoor fitness equipment for

expanding exercise opportunities. The fitness station would be adjacent to the

playground, with appropriate surfacing, and would facilitate upper body, lower body

and core exercises.

Site improvements supporting use of the playing surface, including team and visitor

bleachers, shade structure, safety netting and a scoreboard.

110,000

-110,000

Church Street

Park Capital

Project

Park ADA Improvements:

Installation of Americans with Disabilities Act (ADA)

improvements and amenities at Town of Morrisville Parks to facilitate easier access to

amenities and locations and to provide equipment that is more usable by children of

different physical ability levels.

Connective Morrisville > Engaged inclusive

community Multiple Objectives.

Indian Creek Trailhead ADA Play Equipment – installation site work, playground

surface repair and playground equipment to be installed in the open spaces at the

existing playground. Part of the funding for this project is being donated by a local

youth group, Dedicated to Our Community of North Carolina (DOCNC).

Cedar Fork District Park – concrete pad and sidewalk extension to provide two ADA

accessible parking spaces and connect them to the sidewalk that leads to restrooms

and a picnic shelter.

66,000

-51,000

-15,000

Parkland PIL

DOCNC

Donation