Measures during different project

phases

Errors can be introduced during any project phase:

Design and logic solver FAT

Post FAT changes – implementation of revisions to design documents

Commissioning and validation

Operation

Minor modifications and brownfield changes

Many of the same controls apply through all phases:

Quality procedures – e.g. forces/temporary change logging

Competence