Conclusions

Systems in place to prevent changes post-validation cannot always be

guaranteed 100% effective

Errors identified by code reviews need to be rectified without introducing

more errors

Procedures during operation to prevent modification or forcing cannot be

guaranteed 100% effective during the entire plant life.

Many of the errors described cannot be identified by proof testing

Additional challenges come from mixing asset shutdowns with safety

SIFs, and from secondary convenience shutdown logic.

Neil Wakeling, August 2014