Local Fuel – Shoreham Oil Terminal

Gasoline Ship Import – Layers of Protection Analysis

P & I Design Ltd

DOCUMENT NO: LF364002_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: E DATE: 30.07.15

Tel: + 44 (0)1642 617444

PAGE 28 OF 38

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Initiating Event 3

Cause

Description

Notes

No of

events/year

3

ATG Failure

(Sticks or reads

low). This can

happen during

import or tank to

tank transfer.

The allowable failure data for an ATG

(Not SIL rated) is a frequency of not better

than 1e

-5

/hr. Site reliability data suggests a

figure lower than this however this is not

readily verifiable. Manufacturer gives a

MTBF (all modes) of over 50 years for

Motherwell Gauges. Note: See sensitivity

section 5.4

0.1

AND Enabling Event 1 The Tank has to be on fill and the total

proportion of the year when import to the

tank is ongoing. Probability = 0.00214.

This explicitly assumes that the ATG has

not failed at the start of import. The ATG

is monitored at the start of import, thus the

ATG not failed is confirmed.

0.00214

Overall Frequency of Initiating Event :

(0.1) x (.00214)

= 2.14 x 10

-4

/year

Note 1:Reliability Data for ATG/BPCS

The LOPA uses an order of magnitude 0.1 PFD for the level and control system. This is the

maximum that can be taken for a non SIS system not designed to BS EN 61511. However,

there is a modern control system designed with a significant amount of diagnostics utilising

modern process control instrumentation.