Local Fuel – Shoreham Oil Terminal

Gasoline Ship Import – Layers of Protection Analysis

P & I Design Ltd

DOCUMENT NO: LF364002_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: E DATE: 30.07.15

Tel: + 44 (0)1642 617444

PAGE 26 OF 38

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

Scenarios 2, 3 & 4

Initiating Event 1

Cause

Description

Notes

No of

events/year

1

Whilst importing

from a ship,

overfill of

Gasoline Tank

due to incorrect

line up.

Operator lines up to an incorrect tank.

There are 10 Imports per year.

(Consideration should be given to incorrect

product introduced by incorrect lineup)

Probability of incorrect line-up: 3.74 x 10

-3

based on HEART Data. (See Appendix 2)

Probability based on historical site date,

for operator making routing error over 5

years Nil (Conservative Total Frequency

using HEART: 10 x .00374 /yr)

0.0374

AND I.E. Modifier 1

Cross Check: Operator attends selected

tank at start of import and confirms that,

whilst the transfer is at a low flowrate,

flow has started to the correct tank. The

start level is recorded on the bulk

movement sheet. (See Note Below)

Probability that operator fails to act on not

seeing a flow commence 0.065 based on

HEART Data. Probability based on

historical site date, for operator making

cross check error over 5 years Nil

Conservative probability assumed = 0.1

0.1

Overall Frequency of Initiating Event :

(0.0374) x (1 x 10

-1

)

= 3.74 x 10

-3

/year