City of Morgan Hill

Sanitary Sewer Flow Monitoring and Inflow/Infiltration Study

12-0248 AEG CofMorganHill FM Rpt.docx

Page 40 of 46

Combined I/I Results Summary

Combined I/I analysis considers the totalized volume (in gallons) of both inflow and rainfall-dependent

infiltration over the course of a storm event.

Table 12

summarizes the combined I/I flow results for

the storm event (refer to the

I/I Methods

section for more information on combined I/I analysis

methods and ranking methods). Basins that ranked 1, 2 or 3 in a category are color coded red.

Table 12. Basin Combined I/I Analysis Summary

Metering

Basin

ADWF

(mgd)

Combined

I/I

(gallons)

R-Value

(%)

Combined I/I

per ADWF

Overall

Combined

I/I Ranking

A

Basin 1

0.19

56,400

0.13%

(6)

B

0.15

(7)

7

Basin 2

0.17

47,200

0.10%

(8)

0.15

(8)

8

Basin 3

0.18

166,200

1.00%

(1)

0.52

(1)

1

Basin 4

0.21

114,100

0.26%

(3)

0.27

(4)

4

Basin 5

0.27

90,900

0.22%

(4)

0.18

(6)

5

Basin 6

0.35

136,300

0.12%

(7)

0.18

(5)

6

Basin 7/8

0.40

230,300

0.63%

(2)

0.33

(3)

2

Basin 7

0.24

177,700

1.31%

0.42

Basin 8

0.16

52,000

0.23%

0.19

Basin 9

0.13

133,300

0.22%

(5)

0.49

(2)

3

Basin 10

0.12

16,400

0.06%

(9)

0.06

(9)

9

System

2.65

1,135,500

0.23%

0.22

A

Ranking of 1 represents most inflow after normalization.

B

The number in parenthesis shows the ranking within the individual Category.

The following combined I/I analysis results are noted:

Basins 3, 7/8, 9 and 4 ranked highest for normalized combined I/I contribution.

♦ If isolated, Basin 7 ranks highly within the Basin 7/8 basin and highly within the collection

system.

Figure 29

shows bar graph summaries of the combined I/I analysis. A temperature map by overall

ranking is shown i

n Figure 30.