Previous Page  404 / 431 Next Page
Information
Show Menu
Previous Page 404 / 431 Next Page
Page Background

Figure 6

Site 5 Calibration

Barrett Ave and Railroad Ave.

Sewer System Master Plan

City of Morgan Hill

LEGEND

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0

200

400

600

800

1,000

1,200

1,400

1,600

1,800

0

5

10

15

20

25

30

35

40

45

Rain Intensity (in/hr)

Flow (gpm)

Time (hr)

Wet Weather Event 2 (02/28/14 - 03/01/14)

0

200

400

600

800

1,000

1,200

1,400

0

5

10

15

20

25

30

35

40

45

Flow (gpm)

Time (hr)

Dry Weather Flow

Weekday

Weekend

0.0

0.2

0.4

0.6

0.8

1.0

0

200

400

600

800

1,000

1,200

1,400

1,600

0

5

10

15

20

25

30

35

40

45

Rain Intensity (in/hr)

Flow (gpm)

Time (hr)

Wet Weather Event 1 (02/26/14 - 02/27/14)

Rain Event

Hydraulic Model

V&A Flow Monitoring

V&A Flow Monitoring

June 29, 2016

PRELIMINARY