Figure 8

Site 7 Calibration

Edes St. and Monterey Rd.

Sewer System Master Plan

City of Morgan Hill

LEGEND

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

0

100

200

300

400

500

600

0

5

10

15

20

25

30

35

40

45

Rain Intensity (in/hr)

Flow (gpm)

Time (hr)

Wet Weather Event 2 (02/28/14 - 03/01/14)

0

50

100

150

200

250

300

350

0

5

10

15

20

25

30

35

40

45

Flow (gpm)

Time (hr)

Dry Weather Flow

Weekday

Weekend

0.0

0.2

0.4

0.6

0.8

1.0

0

50

100

150

200

250

300

350

400

0

5

10

15

20

25

30

35

40

45

Rain Intensity (in/hr)

Flow (gpm)

Time (hr)

Wet Weather Event 1 (02/26/14 - 02/27/14)

Rain Event

Hydraulic Model

V&A Flow Monitoring

V&A Flow Monitoring

June 29, 2016

PRELIMINARY