Figure 11
Site 10 Calibration
w/o Monterey Rd. and n/o California
Ave.
Sewer System Master Plan
City of Morgan Hill
LEGEND
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
0
50
100
150
200
250
0
5
10
15
20
25
30
35
40
45
Rain Intensity (in/hr)
Flow (gpm)
Time (hr)
Wet Weather Event 2 (02/28/14 - 03/01/14)
0
50
100
150
200
0
5
10
15
20
25
30
35
40
45
Flow (gpm)
Time (hr)
Dry Weather Flow
Weekday
Weekend
0.0
0.2
0.4
0.6
0.8
1.0
0
20
40
60
80
100
120
140
160
180
0
5
10
15
20
25
30
35
40
45
Rain Intensity (in/hr)
Flow (gpm)
Time (hr)
Wet Weather Event 1 (02/26/14 - 02/27/14)
Rain Event
Hydraulic Model
V&A Flow Monitoring
V&A Flow Monitoring
June 29, 2016
PRELIMINARY