Table of Contents Table of Contents
Previous Page  574 / 601 Next Page
Information
Show Menu
Previous Page 574 / 601 Next Page
Page Background

Article 11: Interpretation and Definitions

Section 11.5. Terms and Uses Defined

11.4.2. Exceptions and Variations

June 23, 2017

Morrisville, NC

Page 11-62

Unified Development Ordinance

R

EDEVELOPMENT

Any development on previously-developed land. Redevelopment of structures or improvements that (a)

existed prior to December 2001, (b) would not result in an increase in built-upon area, and (c) provide

stormwater control at least equal to the previous development is not required to meet the nutrient

loading targets of this Ordinance.

R

EFERENCE

L

EVEL

For purposes of floodplain management, the top of the lowest floor for structures within Special Flood

Hazard Areas designated as Zone A1-A30, AE, A, A99 or AO.

R

EFORESTATION

Replanting or planting of forest plant materials. Reforestation also includes planting for mitigation

purposes in areas not originally forested.

R

EGISTERED

F

ORESTER

A person who by reason of special knowledge and training in natural sciences, mathematics, silviculture,

forest protection, forest mensuration, forest management, forest economics, and forest utilization is

qualified to engage in the practice of forestry.

R

EGULATORY

F

LOOD

P

ROTECTION

E

LEVATION

The elevation above mean sea level to which the reference level of all structures and other development

located within Special Flood Hazard Areas and Future Conditions Flood Hazard Areas must be

protected, as established in

Section 5.6, Floodplain Management.

(a) In “Special Flood Hazard Areas” where Base Flood Elevations (BFEs) have been determined, this

elevation shall be the BFE plus two feet of freeboard.

(b) In “Special Flood Hazard Areas” where no BFE has been established, this elevation shall be at least

two feet above the highest adjacent grade.

(c) In Future Conditions Flood Hazard Areas this elevation shall be the Future Conditions Flood Elevation

plus two feet of freeboard.

R

EMEDY A

V

IOLATION

For purposes of floodplain management, to bring the structure or other development into compliance

with state or local floodplain management regulations, or, if this is not possible, to reduce the impacts of

its noncompliance. Ways that impacts may be reduced including protecting the structure or other

affected development from flood damages, implementing the enforcement provisions of this article or

otherwise deterring future similar violations, or reducing federal financial exposure with regard to the

structure or other development.

R

ESEARCH

L

ABORATORY

A facility that is designed or equipped for basic or applied research of experimental study, testing, or

analysis in the natural and medical sciences or engineering, including any educational activities

associated with and accessory to such research.

R

ESERVATION

The setting aside of real property for a specified use, purpose, or activity. Compare to “dedication.”

which generally involves the conveyance of real property to a government entity for a public purpose.

R

ESIDENTIAL

U

SE OR

D

EVELOPMENT

Development whose primary use(s) is one (or more) of the principal use categories and use types listed

under the Residential Uses classification in Article 4: Use Standards, and as described in Section.