Cover
TAKRAF rapid rail load-out stations
offer high loading precision and
low maintenance requirements.
The operating system is customised
to meet client specified require-
ments. See page 16 of this issue for
an article on Tenova TAKRAF Africa’s
products and services line-up and
its recent contract successes, which
have given it a healthy order book as
it enters 2017.
Editor
Arthur Tassell
Advertising Manager
Bennie Venter
e-mail:
benniev@crown.co.zaDesign & Layout
Darryl James
Circulation
Karen Smith
Publisher
Karen Grant
Deputy Publisher
Wilhelm du Plessis
Printed by:
Shumani Mills Communications
The views expressed in this publication
are not necessarily those of the editor or
the publisher.
Published monthly by:
Crown Publications cc
P O Box 140,
Bedfordview, 2008
Tel: (+27 11) 622-4770
Fax: (+27 11) 615-6108
e-mail:
mining@crown.co.za www.modernminingmagazine.co.zaAverage circulation
(July–September 2016)
4347
MODERN
M I N I N G
CONTENTS
DECEMBER 2016
6
10
20
ARTICLES
REGULARS
26
28
MINING NEWS 4 Tschudi gets back to its nameplate capacity 5 Cardinal announces 4 Moz resource for Namdini 5 Blanket aiming for 60 000 ounces in 2017 6 Ivanhoe makes excellent progress at Kipushi 7 Xtract completes review of Manica project 9 Burey“delighted”by recoveries from Giro samples 10 Venetia Underground contract is a“benchmark” 11 Hatch launches Southern African office in Botswana 12 Chrome/PGM producer more than doubles profits 13 B2Gold’s Fekola gold mine on course for late 2017 start-up 14 VBKom looks at participating in Mokopane tin project 15 Large diamond recovery circuit at Lulo now operational PRODUCT NEWS 42 Zest Energy will power Balama project 43 Workshop cranes installed at coal mine 44 M&C refurbishes rotor poles for platinummine 45 Mahle filter range available from BMG 46 Kwatani puts exciter quality to the test 47 New rigid dump truck tyres from Goodyear 48 SEW-EURODRIVE launches Field Service Department 48 Retrofit option on Multotec cyclones COVER 16 Tenova TAKRAF Africa on a roll GEOTECHNICAL ENGINEERING 20 Drape mesh system provides rockfall protection at Rössing TECHNOLOGY 26 Innovative pre-sink gantry used on Venetia project PHOSPHATE 28 Developer promises a ‘green’ approach at Elandsfontein FEATURE – BULK MATERIALS HANDLING 32 A string of new contracts boosts ELB’s order book 37 Reducing maintenance on chute systems is simple 39 No spillage conveyor system fromTega 41 Powerful conveyor system ordered for copper projectDecember 2016
MODERN MINING
1




