Table of Contents Table of Contents
Previous Page  123 / 164 Next Page
Information
Show Menu
Previous Page 123 / 164 Next Page
Page Background

Simon Storage - ISCo East

No.7 Switchroom – Existing Board (AC) Transition to new MCC(s)

P & I Design Ltd

DOCUMENT NO: SI451003_INS

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 22.02.13

Tel: + 44 (0)1642 617444

PAGE 2 OF 16

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

CONTENTS

1

INTRODUCTION

2

GENERAL REQUIREMENTS

3

METHODS OF WORK AND MATERIALS

4

SCOPE OF WORK

4.1

Switchroom Containment

4.2

MCC 2 Power Supply

4.3

General

4.4

Cabling (Ex Board AC)

4.5

Cabling (Ex existing No.7 Switchroom)

4.6

Contractor Supplied Equipment

4.7

Free Issue Equipment

5

CONTRACT PRICING CONTENTS

5.1

Introduction Contractor Supplied Equipment

5.2

Pricing Preambles/Notes on Pricing

5.3 Schedule of Rates

5.4 Programme

6

TENDER PRICING SUMMARY

APPENDIX

I

Schedules

II

Cable Specifications

Revision History

Revision A – Issue for tender.