Simon Storage - ISCo East

No.7 Switchroom – Existing Board (AC) Transition to new MCC(s)

P & I Design Ltd

DOCUMENT NO: SI451003_INS

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: A DATE: 22.02.13

Tel: + 44 (0)1642 617444

PAGE 11 OF 16

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

4.5.5

P9-9

Existing ISCo Drg. Ref.

SPW-03-675

New P&I Design Drg. Ref.

SI451071_DWG Rev A

Control cabling as listed below to be pulled back from existing board and

terminated to MCC 2 as shown on P&I Drg.

C90060 (To dry run probe)

Drive cable to be pulled back from existing board and terminated to MCC 2 as

shown on P&I Drg.

4.5.6

P9-11

Existing ISCo Drg. Ref.

SPW-03-676

New P&I Design Drg. Ref.

SI451072_DWG Rev A

Control cabling as listed below to be pulled back from existing board and

terminated to MCC 2 as shown on P&I Drg.

C90060 (To dry run probe)

Drive cable to be replaced as shown on cable schedule.

4.6

Contractor Supplied Equipment

Replacement S/S/R stations as necessary

4.7

Free Issue Equipment

None