Background Image
Previous Page  111 / 120 Next Page
Basic version Information
Show Menu
Previous Page 111 / 120 Next Page
Page Background

Wire & Cable ASIA – September/October 2007

109

i

l

11

8 IEC Standard IEC 61034-2:2005 Measurement of smoke density of

cables burning under defined conditions – Part 2: Test procedure and

requirements

9 Gibbons, J, Stevens, G, “Limiting the corrosion hazard from electrical

cables involved in fires” Fire Safety Journal 15 p183-190, 1989

10 Telecom Australia, Design standards Branch, HQ Fire loss report,

1987

11 Stevens, G, “The appraisal and significance of acidic gas emissions

from burning electric cable materials,” 5

th

BEAMA International

Electrical Insulation Conference, Brighton 1986

12 Journeaux, T, “The development and manufacture of Sizewell B

cables,” Proceedings IEE International Conference on control aspects

of the Sizewell B PWR, p74-79 London 1992

13 Hull, T, Stec, A, Paul, K, “Hydrogen Chloride in Fires,” IAFSS

9

th

International symposium, Karlsruhe 2008

14 Hertzberg, T, Blomqvist, P, Lastbom, L, “Influence of HCl and

PVC-smoke on isolated and perfused guinea pig lungs,” SP Fire

Technology Report 57, 2006

15 Journeaux, T, “Development in regulatory classification methods

that will affect the European cable industry and its suppliers,” Flame

Retardants 2008, Interscience Communications Ltd, London

16 Draft prEN 50399 Common test methods for cables under fire

conditions – Heat release and smoke production measurement on

cables during flame spread test – Test apparatus, procedures, results,

CLC TC20/Sec1577/INF June 2008

17 European Commission, Mandate to CEN and CENELEC concerning

the execution of standardisation work for harmonised standards on

power, control and communication cables M/443, Brussels, 18

th

May

2009

18 Johansson, P, Blomquist, P, Sundstrom, B, “Feasibility study of

supplementary FTIR measurements in tests with electric cables

according to Commission Decision 2006/751/EC, FIPEC20Scen1

(prEN50399),” Safety during fire, Europacable, Brussels 2009

19 Messa, S, “Investigation into the smoke effluents of burning cables,”

Safety during fire, Europacable, Brussels 2009

20 Van Hees, P, Nilsson, D, “Simulation of critical evacuation conditions

for fire scenario involving cables and comparison of different cables,”

Safety during fire, Europacable, Brussels 2009

Prysmian Cables & Systems Ltd – UK

Email

:

cables.marketing.uk@prysmian.com

Fax

: +44 238 0295 335

Website

:

www.prysmian.com