Table of Contents Table of Contents
Previous Page  243 / 388 Next Page
Information
Show Menu
Previous Page 243 / 388 Next Page
Page Background

Planning & Development

2017-2021 FINANCIAL PLAN

FUTURE INITIATIVES, GOALS & OBJECTIVES



Continued enhancement of Open Data available to the general public.



Continue the improvements of the

remaining space at the former City Hall

building to accommodate the growth of

the RCMP;



Support the new business energy

outreach program for local businesses

being developed by Metro Vancouver

and ensure that Surrey businesses can

access and benefit from the program to

reduce costs and energy use;



Complete the Cloverdale Fairgrounds

Master Plan Review;



Review and update secondary plans to

reflect changes resulting from

development approvals and changing

development conditions since adoption

of these plans;



Continue to apply sustainability

principles in new construction projects

and retro-fit existing building systems to

increase energy efficiency and reduce

carbon emissions;



Encourage significant development

applications in City Centre to plan a

future connection to a district energy

utility system;



Continue to implement the approved

Community Climate Action Strategy,

including moving forward with key

priorities in both the Community Energy

and Emissions Plan and the Climate

Adaptation Strategy, such as the pilot

density bonusing program in West

Clayton and integration of adaptation

into the new city-wide Risk Manage-

ment framework;



In consultation with TransLink and the

Engineering Department, finalize

Frequent Transit Corridor Development

Plans for existing and future rapid

transit corridors in Surrey;



Complete the process to relocate the

City Centre arenas to South

Westminster;



Start construction of new ice arenas in

South Westminster and Cloverdale;



Complete design and start construction

of the new Community Centre in

Clayton; and



Complete construction of the new South

Surrey Operations Centre.



Support the RCMP’s growth with planning, design and construction of new and

renovated space.

INCLUSION

BUILT ENVIRONMENT & NEIGHBOURHOODS

PUBLIC SAFETY

237