Planned Developments in the

Zambezi Basin

Proposed Dams and Hydropower Projects

Water has many critical roles in the realization

of socio-economic development in southern

Africa. One such role is to provide hydropower

to help the region to meet its ever-growing

demand for energy. SADC Member States,

through the Southern African Power Pool

(SAPP), have thus planned to commission a

number of hydropower projects in the Zambezi

River Basin. The Basin is considered to have

enormous capacity to produce sufficient power

for the region if fully harnessed.

SAPP estimates that the Zambezi River has

the potential to produce more than 20 000

Megawatts (MW) of electricity (Tauya 2006).

However, only 23 per cent of this potential

is being harnessed, largely from two main

sites: the Kariba Dam between Zambia and

Zimbabwe, and the Cahora Bassa Dam in

Mozambique (SARDC 2009c). To fully exploit its

potential, various projects have been identified

for commissioning in the Zambezi Basin.

Batoka Gorge Hydropower Station

The Batoka gorge is located about 50 km

downstream of Victoria Falls between Zambia

and Zimbabwe. When operational, it has the

capacity to produce up to 1 600 MW. National

power utilities from the two countries are ready

to begin work on the project. However, limited

funding, environmental concerns and technical

challenges have stalled the process. Zambia and

Zimbabwe have also identified other sites on the

Zambezi River fromwhich they could jointly tap

electricity. These sites include the Devils Gorge

(1 200 MW), Mutapa Gorge (1 085 MW) and

Victoria Falls South (390 MW) (Tumbare, 2005).

Figure 5.3

0

200

100

200

300

400

500

600

700

800

900

200

400

Existing site

Victoria Falls

Potential site

Source: SADC and ZRA 2007. Rapid Assessment Report: IntegratedWater Resources Management Strategy for the Zambezi River Basin. SADCWater Division, Gaborone

600

Distance from Victoria falls (kilometres)

Existing and potential hydropower projects on the Zambezi River

Elevation

above sea

level

800

1 000

1 200

1 400

Zambezi River

Batoka gorge

Devils gorge

Kariba dam

Mupata gorge

Chaora Bassa

Table 5.1. Rehabilitation and Planned Energy Projects in the Zambezi Basin

Source: Musaba 2012

Angola

Botswana

Malawi

Mozambique

Namibia

Tanzania

Zambia

Zimbabwe

Projected Generation Capacity, MW

2011

150

120

-

-

23

60

-

290

2012

150

120

-

-

23

60

-

290

2013

150

120

-

-

23

60

-

290

2014

150

120

-

-

23

60

-

290

2015

150

120

-

-

23

60

-

290

Total

150

120

-

-

23

60

-

290