Ten-Year Network Development Plan 2017 Main Report |
159
ADVANCED NON-FID
Type
Code
Name
Country
Promoter
PCI
2
nd
List
Commission-
ing Year
Pipeline including CS TRA-N-807 Expansion NEL
Germany
Gasunie Deutschland, NEL Gastransport, Fluxys
Deutschland
No
2020
Pipeline including CS TRA-N-010 Poseidon Pipeline
Greece
Natural Gas Submarine Interconnector Greece-It-
aly Poseidon S.A
Yes
2020
Pipeline including CS TRA-N-358
Development on the Romanian territory of the NTS
(BG–RO–HU–AT Corridor)
Romania SNTGN Transgaz S.A.
Yes
2020
Pipeline including CS TRA-N-362
Development on the Romanian territory of the Southern
Transmission Corridor
Romania SNTGN Transgaz SA
Yes
2020
Pipeline including CS TRA-N-390
Upgrade of Rogatec interconnection
(M1A/1 Interconnection Rogatec)
Slovenia
Plinovodi d.o.o.
Yes
2020
LNG Terminal
LNG-N-032 Project GO4LNG LNG terminal Gothenburg
Sweden
Swedegas AB
Yes
2020
Pipeline including CS TRA-N-302 Interconnection Croatia-Bosnia and Herzegovina (South) Croatia
Plinacro Ltd
No
2021
Pipeline including CS TRA-N-808 Transport of gas volumes to the Netherlands
Germany
Gasunie Deutschland Technical Services GmbH No
2021
LNG Terminal
LNG-N-198 Porto Empedocle LNG
Italy
Nuove Energie S.r.l.
No
2021
Pipeline including CS TRA-N-283
3
rd
IP between Portugal and Spain
(pipeline Celorico–Spanish border)
Portugal
REN-Gasodutos, S.A.
Yes
2021
Pipeline including CS TRA-N-320 Carregado Compressor Station
Portugal
REN-Gasodutos, S.A.
No
2021
Pipeline including CS TRA-N-161 South Transit East Pyrenees (STEP)–ENAGÁS
Spain
Enagás Transporte, S.A.U.
Yes
2021
Pipeline including CS TRA-N-068 Ionian Adriatic Pipeline
Croatia
Plinacro Ltd
No
2022
Pipeline including CS TRA-N-252 South Transit East Pyrenees (STEP)–TIGF
France
TIGF
Yes
2022
Pipeline including CS TRA-N-974 LARINO–RECANATI Adriatic coast backbone
Italy
Società Gasdotti Italia
No
2022
LESS-ADVANCED NON-FID
Type
Code
Name
Country
Promoter
PCI
2
nd
List
Commission-
ing Year
Pipeline including CS TRA-N-524
Enhancement of Transmission Capacity of
Slovak–Hungarian interconnector
Hungary
Magyar Gáz Tranzit Zrt.
Yes
2017
Pipeline including CS TRA-N-636
Development of Transmission Capacity at
Slovak–Hungarian interconnector
Hungary
Magyar Gáz Tranzit Zrt.
Yes
2017
Pipeline including CS TRA-N-645 HU–UA Interconnector (Ukrainian section)
Ukraine
PJSC Ukrtransgaz
No
2017
Pipeline including CS TRA-N-660 Gas to the West
United
Kingdom
West Transmission Limited
No
2017
Pipeline including CS TRA-N-954 TAG Reverse Flow
Austria
Trans Austria Gasleitung GmbH
No
2018
Pipeline including CS TRA-N-379 A project for the construction of a gas pipeline BG-RO Bulgaria Bulgartransgaz EAD
Yes
2018
Pipeline including CS TRA-N-545
Infrastructure gas pipeline
Skopje–Tetovo–Gostivar– Albanian border
FYROM GA-MA joint stock company Skopje
No
2018
Storage Facility
UGS-N-203 Preesall Gas Storage
United
Kingdom
Halite Energy Group Ltd
No
2018
LNG Terminal
LNG-N-962 Tallinn LNG
Estonia
Vopak E.O.S. AS / Vopak LNG Holdings B.V/ Port of
Tallinn AS
Yes
2019
Pipeline including CS TRA-N-582 Macedonian part of Tesla project
FYROM GA-MA joint stock company Skopje
Yes
2019
Pipeline including CS TRA-N-340 VDS Wertingen
Germany
bayernets GmbH
No
2019
Pipeline including CS TRA-N-941 Metering and Regulating station at Nea Messimvria
Greece
DESFA S.A.
Yes
2019
Storage Facility
UGS-N-034 Syderiai
Lithuania JSC Lietuvos energija AB
No
2019
Pipeline including CS TRA-N-139
Interconnection of the NTS with the DTS and reverse flow
at Isaccea
Romania SNTGN Transgaz SA
Yes
2019
Pipeline including CS TRA-N-964
New NTS developments for taking over gas from the
Black Sea shore
Romania SNTGN Transgaz SA
No
2019
Pipeline including CS TRA-N-365 M6 Ajdovščina – Lucija
Slovenia
Plinovodi d.o.o.
No
2019