Table of Contents Table of Contents
Previous Page  159 / 288 Next Page
Information
Show Menu
Previous Page 159 / 288 Next Page
Page Background

Ten-Year Network Development Plan 2017 Main Report |

159

ADVANCED NON-FID

Type

Code

Name

Country

Promoter

PCI

2

nd

List

Commission-

ing Year

Pipeline including CS TRA-N-807 Expansion NEL

Germany

Gasunie Deutschland, NEL Gastransport, Fluxys

Deutschland

No

2020

Pipeline including CS TRA-N-010 Poseidon Pipeline

Greece

Natural Gas Submarine Interconnector Greece-It-

aly Poseidon S.A

Yes

2020

Pipeline including CS TRA-N-358

Development on the Romanian territory of the NTS

(BG–RO–HU–AT Corridor)

Romania SNTGN Transgaz S.A.

Yes

2020

Pipeline including CS TRA-N-362

Development on the Romanian territory of the Southern

Transmission Corridor

Romania SNTGN Transgaz SA

Yes

2020

Pipeline including CS TRA-N-390

Upgrade of Rogatec interconnection

(M1A/1 Interconnection Rogatec)

Slovenia

Plinovodi d.o.o.

Yes

2020

LNG Terminal

LNG-N-032 Project GO4LNG LNG terminal Gothenburg

Sweden

Swedegas AB

Yes

2020

Pipeline including CS TRA-N-302 Interconnection Croatia-Bosnia and Herzegovina (South) Croatia

Plinacro Ltd

No

2021

Pipeline including CS TRA-N-808 Transport of gas volumes to the Netherlands

Germany

Gasunie Deutschland Technical Services GmbH No

2021

LNG Terminal

LNG-N-198 Porto Empedocle LNG

Italy

Nuove Energie S.r.l.

No

2021

Pipeline including CS TRA-N-283

3

rd

IP between Portugal and Spain

(pipeline Celorico–Spanish border)

Portugal

REN-Gasodutos, S.A.

Yes

2021

Pipeline including CS TRA-N-320 Carregado Compressor Station

Portugal

REN-Gasodutos, S.A.

No

2021

Pipeline including CS TRA-N-161 South Transit East Pyrenees (STEP)–ENAGÁS

Spain

Enagás Transporte, S.A.U.

Yes

2021

Pipeline including CS TRA-N-068 Ionian Adriatic Pipeline

Croatia

Plinacro Ltd

No

2022

Pipeline including CS TRA-N-252 South Transit East Pyrenees (STEP)–TIGF

France

TIGF

Yes

2022

Pipeline including CS TRA-N-974 LARINO–RECANATI Adriatic coast backbone

Italy

Società Gasdotti Italia

No

2022

LESS-ADVANCED NON-FID

Type

Code

Name

Country

Promoter

PCI

2

nd

List

Commission-

ing Year

Pipeline including CS TRA-N-524

Enhancement of Transmission Capacity of

Slovak–Hungarian interconnector

Hungary

Magyar Gáz Tranzit Zrt.

Yes

2017

Pipeline including CS TRA-N-636

Development of Transmission Capacity at

Slovak–Hungarian interconnector

Hungary

Magyar Gáz Tranzit Zrt.

Yes

2017

Pipeline including CS TRA-N-645 HU–UA Interconnector (Ukrainian section)

Ukraine

PJSC Ukrtransgaz

No

2017

Pipeline including CS TRA-N-660 Gas to the West

United

Kingdom

West Transmission Limited

No

2017

Pipeline including CS TRA-N-954 TAG Reverse Flow

Austria

Trans Austria Gasleitung GmbH

No

2018

Pipeline including CS TRA-N-379 ​A project for the construction of a gas pipeline BG-RO Bulgaria Bulgartransgaz EAD

Yes

2018

Pipeline including CS TRA-N-545

Infrastructure gas pipeline

Skopje–Tetovo–Gostivar– Albanian border

FYROM GA-MA joint stock company Skopje

No

2018

Storage Facility

UGS-N-203 Preesall Gas Storage

United

Kingdom

Halite Energy Group Ltd

No

2018

LNG Terminal

LNG-N-962 Tallinn LNG

Estonia

Vopak E.O.S. AS / Vopak LNG Holdings B.V/ Port of

Tallinn AS

Yes

2019

Pipeline including CS TRA-N-582 Macedonian part of Tesla project

FYROM GA-MA joint stock company Skopje

Yes

2019

Pipeline including CS TRA-N-340 VDS Wertingen

Germany

bayernets GmbH

No

2019

Pipeline including CS TRA-N-941 Metering and Regulating station at Nea Messimvria

Greece

DESFA S.A.

Yes

2019

Storage Facility

UGS-N-034 Syderiai

Lithuania JSC Lietuvos energija AB

No

2019

Pipeline including CS TRA-N-139

Interconnection of the NTS with the DTS and reverse flow

at Isaccea

Romania SNTGN Transgaz SA

Yes

2019

Pipeline including CS TRA-N-964

New NTS developments for taking over gas from the

Black Sea shore

Romania SNTGN Transgaz SA

No

2019

Pipeline including CS TRA-N-365 M6 Ajdovščina – Lucija

Slovenia

Plinovodi d.o.o.

No

2019