Ten-Year Network Development Plan 2017 Main Report |

157

FID PROJECTS

Type

Code

Name

Country

Promoter

PCI

2

nd

List

Commission-

ing Year

Pipeline including CS TRA-F-334

Compressor station 1 at the Croatian gas transmission

system

Croatia

Plinacro Ltd

Yes

2017

Pipeline including CS TRA-F-241 MONACO section phase I (Burghausen-Finsing)

Germany

bayernets GmbH

No

2017

Pipeline including CS TRA-F-291 NOWAL - Nord West Anbindungsleitung

Germany

GASCADE Gastransport GmbH

No

2017

Pipeline including CS TRA-F-768 Extension Receiving Terminal Greifswald

Germany

NEL Gastransport, Fluxys Deutschland,

Gasunie Deutschland

No

2017

LNG Terminal

LNG-F-147 Revythoussa (2

nd

upgrade)

Greece

DESFA S.A.

No

2017

Pipeline including CS TRA-F-137 Interconnection Bulgaria – Serbia

Bulgaria Ministry of Energy

Yes

2018

Pipeline including CS TRA-F-378 Interconnector Greece-Bulgaria (IGB Project)

Bulgaria ICGB a.d.

Yes

2018

Pipeline including CS TRA-F-43 Val de Saône project

France

GRTgaz

Yes

2018

Pipeline including CS TRA-F-45 Reverse capacity from CH to FR at Oltingue

France

GRTgaz

No

2018

Pipeline including CS TRA-F-331 Gascogne Midi

France

TIGF - GRTgaz

Yes

2018

Pipeline including CS TRA-F-208 Reverse Flow TENP Germany

Germany

Fluxys TENP GmbH & Open Grid Europe GmbH Yes

2018

Pipeline including CS TRA-F-337 CS Rothenstadt

Germany

GRTgaz Deutschland GmbH

No

2018

Pipeline including CS TRA-F-343 Pipeline project “Schwandorf-Finsing”

Germany

Open Grid Europe GmbH

No

2018

Pipeline including CS TRA-F-344 Compressor station “Herbstein”

Germany

Open Grid Europe GmbH

No

2018

Pipeline including CS TRA-F-345 Compressor station “Werne”

Germany

Open Grid Europe GmbH

No

2018

Pipeline including CS TRA-F-753 West to East operation of the IP Waidhaus

Germany

GRTgaz Deutschland GmbH

No

2018

Pipeline including CS TRA-F-214

Support to the North West market and bidirectional

cross-border flows

Italy

Snam Rete Gas S.p.A.

Yes

2018

Pipeline including CS TRA-F-230 Reverse Flow Transitgas Switzerland

Switzerland FluxSwiss

No

2018

Pipeline including CS TRA-F-221 TANAP – Trans Anatolian Natural Gas Pipeline Project

Turkey

SOCAR (The State Oil Company of the Azerbaijan

Republic)

Yes

2018

LNG Terminal

LNG-F-229 Zeebrugge LNG Terminal – 5

th

Tank & 2

nd

Jetty

Belgium Fluxys LNG

No

2019

Pipeline including CS TRA-F-86

Interconnection Croatia/Slovenia

(Lučko – Zabok – Rogatec)

Croatia

Plinacro Ltd

Yes

2019

Pipeline including CS TRA-F-937 Nord Stream 2

Germany

Nord Stream 2 AG

No

2019

Pipeline including CS TRA-F-051 Trans Adriatic Pipeline

Greece

Trans Adriatic Pipeline AG

Yes

2019

Storage Facility

UGS-F-1045 Bordolano Second phase

Italy

STOGIT S.p.A.

No

2019

LNG Terminal

LNG-F-183 Tenerife LNG Terminal

Spain

Gascan

No

2020

LNG Terminal

LNG-F-163 Gran Canaria LNG Terminal

Spain

Gascan

No

2021

Pipeline including CS TRA-F-1028 Albania - Kosovo Gas Pipeline

Albania

Min. of Energy and Industry of AL &

Min. of Economic Development of KO

No

2022

Storage Facility

UGS-F-260 System Enhancements – Stogit – on-shore gas fields

Italy

STOGIT

No

2026

Pipeline including CS TRA-F-017 System Enhancements – Eustream

Slovakia

eustream, a.s.

No

2026

LNG Terminal

LNG-F-178 Musel LNG terminal

Spain

Enagás Transporte, S.A.U.

No

2026

Pipeline including CS TRA-F-025 Industrial Emissions Directive (IPPC) – FID

United

Kingdom

National Grid Gas plc

No

Unknown

4.5.8 LIST OF PROJECTS

 1)

 1) The 3 following projects were already commissioned by end 2016, and are therefore not reported in the table: Bordolano

First Phase (UGS-F-259), Romania –Bulgaria Interconnection (TRA-F-029) and Exit Capacity Budince (TRA-F-1047).