Table of Contents Table of Contents
Previous Page  32 / 127 Next Page
Information
Show Menu
Previous Page 32 / 127 Next Page
Page Background

No linepack flexibility service implemented

Linepack flexibility service partially implemented

* Czech Republic partially implemented the provisions for NDM off-takes. In Austria, NDM forecasts are provided by DAM based on data from DSOs.

Linepack flexibility service implemented

3.8 LINEPACK FLEXIBILITY SERVICE (CHAPTER IX OF BAL NC)

TSOs may offer a linepack flexibility service to

the shippers under the NRA’s approval of the re-

lated terms and conditions. This commercial

service which utilises the flexibility within the

transmission system shall be consistent with the

responsibility of the shipper to balance its inputs

and off-takes throughout the gas day.

Five countries (CZ, FR, NL, PT and SE) reported

already offering linepack flexibility service prior

to or on 1 October 2016 (see map 10). Of the

three countries (ES, PT and SI) where the intro-

duction of this service has been discussed or

previously foreseen, only Portugal decided final-

ly to implement this service.

All five countries reported that the terms and

conditions were approved by the NRA. While

four of them (FR, NL, PT and SE) implemented

the provisions of the linepack flexibility service,

the TSO in Czech Republic responded that there

are doubts whether all criteria foreseen in art.

44.1 of BAL NC are met due to different legal

interpretations.

In France, the NRA decided that the neutrality

mechanism does not apply to the linepack flexi-

bility service according to art. 43.5 of BAL NC,

due to the fact that linepack flexibility service is

considered to be similar to any other service

provided by the TSO.

Of the countries applying linepack flexibility

service, the Netherlands implemented WDOs.

The TSO therefore also confirmed the prioritisa-

tion of reducing WDO over the provision of a

linepack flexibility service (art. 44.2 BAL NC).

Further details about the publication of the relat-

ed documents can be found in

Annex I, table 1.3 .

Map 10: 

Implementation of linepack flexibility service by 1 October 2016

32 |

ENTSOG BAL NC Monitoring Report 2016