No current or planned balancing platform foreseen
Planned balancing platform
* The above map should be viewed in conjunction with Map 1 in section 3.1.1. The existence of a trading platform ful lling all conditions in Article 10
of BAL NC makes it principally unnecessary to establish a dedicated balancing platform. All countries with existing or planned balancing platforms do not
have a trading platform, except for Germany and Poland.
Existing balancing platform
Map 11:
Interim measures – Overview of current or planned usage of balancing platform
a)
Balancing platform as interim measure (Art. 47 of BAL NC)
According to BAL NC provisions, a balancing
platform can be established for the purpose of
TSOs balancing in case the short term wholesale
gas market has or is anticipated to have insuffi-
cient liquidity or where temporal and locational
products required cannot reasonably be pro-
cured on this market.
In four countries (DE, PL, SK, SE) a balancing
platform is already in use. In Poland, the balanc-
ing platform operates in all three balancing
zones (H-gas, L-gas, TGPS) using interim bal-
ancing products.
Compared to the previous report, Greece fore-
sees the implementation of a balancing platform
in Q3-2017 while Romania will no longer contin-
ue to implement a balancing platform.
Map 11 below shows an overview of the current
or planned usage of balancing platforms in
Europe.
a) The map should be viewed in
conjunction with
Map 1 in section 3.1.1 .The existence of a trading
platform fulfilling all conditions in
Article 10 of BAL NC makes it prin-
cipally unnecessary to establish a
dedicated balancing platform. All
countries with existing or planned
balancing platforms do not have a
trading platform, except for
Germany and Poland.
ENTSOG BAL NC Monitoring Report 2016 |
35