Safety Instrument System

Tank Overfill Protection - Management of Functional Safety

P & I Design Ltd

DOCUMENT NO: SI277102_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE:10.10.12

Tel: + 44 (0)1642 617444

PAGE 21 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

17.0 DECOMMISSIONING

Management Procedures must include for the decommissioning of the Safety Instrument

System. These should follow the Management of Change Procedure but should also include

that, on decommissioning of the system have the following been considered:

Functional safety during decommissioning

The impact on systems interfacing with the SIS

Has a decommissioning plan been implemented and approved

Following any modification the following should be documented:

Has all documentation affected by the modification been revised

Has the modification been fully proof tested

Has a detailed modification sheet been completed

Roles and Responsibilities

:

Immingham Storage Ltd:

Assign competent persons to be responsible for the implementation and approval of a

decommissioning plan.

Following decommissioning, assign competent person(s) to be responsible for ensuring that

all documentation has been archived