www.pidesign.co.uk15.0 MODIFICATION
Management Procedures must include for any modifications of the Safety Instrument System.
These should follow the Management of Change Procedure but should also include, that
following the requirement for a modification of the SIS the following have been considered
and implemented:
Description of the modification
Reason for the modification
Identified hazards which may be affected
Analysis of the impact of the modification
Approval for the modification
Following any modification the following should be documented:
Have all documentation affected by the modification been revised
Have the modification been fully proof tested
Has a detailed modification sheet been completed
Roles and Responsibilities:
Immingham Storage Ltd:
Assign competent persons to be responsible for any modification to the Safety Instrument
System.
Personnel assigned to this phase to be detailed on competition of stage 4 Review.
A FSA meeting Stage 5 should be held to confirm that any modifications does not impede on