Tank Overfill Protection - Management of Functional Safety

P & I Design Ltd

DOCUMENT NO: SI277102_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE:10.10.12

Tel: + 44 (0)1642 617444

PAGE 15 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

13.0 OPERATION AND MAINTENANCE

13.1 Documentation Manuals

The final SIS Manuals are to be completed and issued by P&I Design Ltd to Immingham

Storage Ltd to ensure that the operation and maintenance of the Safety Instrument System can

be continued.

Reference Document:

Roles and Responsibilities

:

Immingham Storage Ltd:

Assign competent person to manage the control of and distribution of the manuals to all

relevant competent persons..

Personnel assigned to this phase

Steve Waterman – Terminal Engineer

P&I Design Ltd:

Complete final SIS manual and issue to Immingham Storage Ltd ensuring it meets the

requirements of BS EN 61511.

The SIS Manual includes all manufacturer’s installation and maintenance documentation

along with all testing and as built documents.

Personnel assigned to this phase:

Production of Manual

D. Smith

Checking

M. Morgan

13.2 Operation and Maintenance

Immingham Storage Ltd are responsible for operating and maintaining the SIS in order that

it’s performance does not degrade.

Maintenance personnel must be aware that all work on the SIS must be recorded and that no

unauthorised modifications are performed. All modifications must be reviewed prior to

installing.

Personnel assigned to this phase

A. Rhodes – Terminal Manager

S. Waterman – Terminal Engineer

.