Safety Instrument System

Tank Overfill Protection - Management of Functional Safety

P & I Design Ltd

DOCUMENT NO: SI277102_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE:10.10.12

Tel: + 44 (0)1642 617444

PAGE 10 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

10.0 DESIGN & DEVELOPMENT OF SIS

The design for a Safety Instrument System will be produced by P&I Design Ltd. Reference

Document SI277001.RPT.

Roles and Responsibilities:

Immingham Storage Ltd:

Competent person to review Design Documentation in conjunction with P&I Design Ltd.

Competent person(s) to participate in design reviews.

Personnel assigned to this phase: From

M.Cook – Environmental & Technical Assistant

C. Newstead – Environmental & Technical Manager

P. Jobling – Group Safety Compliance Manager

A.Dixon - Group SHE officer

A. Rhodes – Terminal Manager

Any of the above may carry out the checking.

P&I Design Ltd:

Produce SIS Design Documentation and ensure that it meets the requirements of the Safety

Requirements Specification as well as the requirements of BS EN 61511.

The SIS Specification and Design will include manufacturer’s certification for PFD data and

SIS calculation.

Document design review meetings.

Personnel assigned to this phase:

Production of Design Document

D.S.Regan

Review

P.J. Parkin

M. Morgan

On completion of the Design and Development or at various stages during the design, a

design review will be carried out as per P&I Design Ltd. Quality Procedures.