Safety Instrument System

Tank Overfill Protection - Management of Functional Safety

P & I Design Ltd

DOCUMENT NO: SI277102_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE:10.10.12

Tel: + 44 (0)1642 617444

PAGE 8 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

8.0 SPECIFICATION OF SAFETY INSTRUMENT SYSTEM

The requirement for a Safety Instrument System was confirmed from the LOPA assessments

and a Safety Requirement Specification is to be produced by P&I Design Ltd. Reference

Document SI277010_RPT

Roles and Responsibilities:

Immingham Storage Ltd:

Competent person to Check and Confirm Safety Requirement Specification represents the

design intent of the Safety Instrument System and LOPA study.

Personnel assigned to this phase:

M.Cook – Environmental & Technical Assistant

C. Newstead – Environmental & Technical Manager

P. Jobling – Group Safety Compliance Manager

A.Dixon - Group SHE officer

A. Rhodes – Terminal Manager

Any of the above may perform the checking.

P&I Design Ltd:

Produce Safety Requirement Specification and ensure that it meets the requirements of the

LOPA report as well as the requirements of BS EN 61511.

Personnel assigned to this phase:

Production of SRS D.S. Regan

Review

P.J. Parkin

M. Morgan

D.R. Ransome

At this stage, a functional Safety assessment Stage 1 will be carried out as per the

requirements of BS EN61511. Reference