Safety Instrument System

Tank Overfill Protection - Management of Functional Safety

P & I Design Ltd

DOCUMENT NO: SI277102_RPT

2 Reed Street, Thornaby, UK, TS17 7AF

ISSUE: B DATE:10.10.12

Tel: + 44 (0)1642 617444

PAGE 12 OF 22

Fax: + 44 (0)1642 616447

www.pidesign.co.uk

11.2 Post Installation

Upon Completion of the installation, commissioning and validation, all completed

documentation is to be reviewed.

Roles and Responsibilities:

P&I Design Ltd competent person(s) to check the installation against the following

documentation to ensure that the installation was complete and in accordance with the SIS

design and that any modifications necessary were documented, reviewed and the

documentation revised.

Responsible Person(s)

SIS Panel Factory Acceptance Test

D.B. Faulkner

SIS Installation Specification

D.B. Faulkner

Shutdown Conditions Functional Test Document

D.B. Faulkner

Documentation and Verification Document

D.B. Faulkner

Process Conditions Functional Test Document

D.B. Faulkner

Analysis and Approval Document

D.B. Faulkner

Installation Approval and Inspection Document

D.B. Faulkner

Equipment Failure Testing Document

D.B. Faulkner

On completion of the installation and testing a functional safety assessment Stage 3 should be

carried out to ensure the installed SIS meets the requirements of the design and BS EN 61511.